Automated parking tower mid-installation with construction crane lifting a steel beam, illustrated in editorial style
Pilot Projects

Our first installations are commissioning now.

We're transparent about being a young company with a long track record. Here's the technology we deliver and where the first sites are coming online.

Our Range

Four engineered systems. Designed, manufactured, installed.

From a single hydraulic stacker for a villa to a 200-car automated tower — four engineered systems we deliver end-to-end from our Vasai facility.

Tower Systems

High-density vertical parking for tight urban footprints — up to 30+ levels in a single shaft.

Puzzle Systems

Modular grid-based parking ideal for residential basements and podium levels.

Hydraulic Stackers

2- and 3-level stackers that double or triple existing parking capacity with minimal civil work.

Multi-Level Car Parks (MLCP)

Turnkey structural and mechanised MLCPs for commercial, municipal, and mixed-use developments.

What's Coming

Pilot projects in commissioning.

First installations — Q2 FY27 onwards.

Our first pilot projects begin commissioning from Q2 FY27. Site details will be published after project sign-off. Want to be one of our reference projects?

Contact us
Get In Touch

Be our next success story.

Every project starts with a site visit. We'll come to you.

Enquire Now